Customization: | Available |
---|---|
Certification: | ISO, CCC, CE |
Surface: | Smooth |
Still deciding? Get samples of US$ 5/Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Nominal Diameter | Approximate Weight | Minimum Breaking Load Corresponding To Rope Grade Of | |||||
1570 | 1670 | 1770 | 1870 | 1960 | 2160 | ||
MM | KG/100M | KN | KN | KN | KN | KN | KN |
12 | 66.2 | 81.4 | 86.6 | 91.8 | 96.9 | 102 | 112 |
14 | 90.2 | 111 | 118 | 125 | 132 | 138 | 152 |
16 | 118 | 145 | 154 | 163 | 172 | 181 | 199 |
18 | 149 | 183 | 195 | 206 | 218 | 229 | 252 |
20 | 184 | 226 | 240 | 255 | 269 | 282 | 311 |
22 | 223 | 274 | 291 | 308 | 326 | 342 | 376 |
24 | 265 | 326 | 346 | 367 | 388 | 406 | 448 |
26 | 311 | 382 | 406 | 431 | 455 | 477 | 526 |
28 | 361 | 443 | 471 | 500 | 528 | 553 | 610 |
30 | 414 | 509 | 541 | 573 | 606 | 635 | 700 |
32 | 471 | 579 | 616 | 652 | 689 | 723 | 796 |
34 | 532 | 653 | 695 | 737 | 778 | 816 | 899 |
36 | 596 | 732 | 779 | 826 | 872 | 914 | 1010 |
38 | 664 | 816 | 868 | 920 | 972 | 1020 | 1120 |
40 | 736 | 904 | 962 | 1020 | 1080 | 1130 | 1240 |
42 | 811 | 997 | 1060 | 1120 | 1190 | 1240 | 1370 |
44 | 891 | 1090 | 1160 | 1230 | 1300 | 1370 | 1510 |
46 | 973 | 1200 | 1270 | 1350 | 1420 | 1490 | 1650 |
48 | 1060 | 1300 | 1390 | 1470 | 1550 | 1630 | 1790 |
50 | 1150 | 1410 | 1500 | 1590 | 1680 | 1760 |
1. Swift and timely delivery of our products
2. Expertise in steel wire rope production backed by over 40 years of experience
3. Comprehensive array of testing equipment to ensure peak product performance
4. Rigorous quality control processes to uphold high standards
5. We are a manufacturer offering competitive factory-direct prices
Payment Terms | T/T | EXW | 30% T/T in advance, the balance to be paid before dispatch |
FOB | |||
CIF | 30% T/T in advance, the balance to be paid against the copy of B/L | ||
CFR (C&F) | |||
L/C | Irrevocable L/C at sight could be accepted if amount above US $50,000.00 | ||
Delivery Time | 7 to 10 working days after receiving advanced payment |