Customization: | Available |
---|---|
Certification: | ISO, CCC, CE |
Surface: | Smooth |
Still deciding? Get samples of US$ 5/Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Nominal Diameter | Approximate Weight | Minimum Breaking Load Corresponding To Rope Grade Of | |||||
1570 | 1670 | 1770 | 1870 | 1960 | 2160 | ||
MM | KG/100M | KN | KN | KN | KN | KN | KN |
12 | 66.2 | 81.4 | 86.6 | 91.8 | 96.9 | 102 | 112 |
14 | 90.2 | 111 | 118 | 125 | 132 | 138 | 152 |
16 | 118 | 145 | 154 | 163 | 172 | 181 | 199 |
18 | 149 | 183 | 195 | 206 | 218 | 229 | 252 |
20 | 184 | 226 | 240 | 255 | 269 | 282 | 311 |
22 | 223 | 274 | 291 | 308 | 326 | 342 | 376 |
24 | 265 | 326 | 346 | 367 | 388 | 406 | 448 |
26 | 311 | 382 | 406 | 431 | 455 | 477 | 526 |
28 | 361 | 443 | 471 | 500 | 528 | 553 | 610 |
30 | 414 | 509 | 541 | 573 | 606 | 635 | 700 |
32 | 471 | 579 | 616 | 652 | 689 | 723 | 796 |
34 | 532 | 653 | 695 | 737 | 778 | 816 | 899 |
36 | 596 | 732 | 779 | 826 | 872 | 914 | 1010 |
38 | 664 | 816 | 868 | 920 | 972 | 1020 | 1120 |
40 | 736 | 904 | 962 | 1020 | 1080 | 1130 | 1240 |
42 | 811 | 997 | 1060 | 1120 | 1190 | 1240 | 1370 |
44 | 891 | 1090 | 1160 | 1230 | 1300 | 1370 | 1510 |
46 | 973 | 1200 | 1270 | 1350 | 1420 | 1490 | 1650 |
48 | 1060 | 1300 | 1390 | 1470 | 1550 | 1630 | 1790 |
50 | 1150 | 1410 | 1500 | 1590 | 1680 | 1760 |
1. Swift and timely delivery to meet your urgent needs.
2. Expertise in steel wire rope manufacturing with over 40 years of experience.
3. Comprehensive testing equipment ensuring exceptional product performance.
4. Rigorous quality control processes guaranteeing superior standards.
5. As a direct factory, we offer competitive pricing advantages.
Payment Terms | T/T | EXW | 30% T/T in advance, the balance to be paid before dispatch |
FOB | |||
CIF | 30% T/T in advance, the balance to be paid against the copy of B/L | ||
CFR (C&F) | |||
L/C | Irrevocable L/C at sight could be accepted if amount above US $50,000.00 | ||
Delivery Time | 7 to 10 working days after receiving advanced payment |