Customization: | Available |
---|---|
Certification: | ISO, CCC, CE |
Surface: | Smooth |
Still deciding? Get samples of US$ 5/Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Nominal Diameter | Approximate Weight | Minimum Breaking Load Corresponding To Rope Grade Of | |||||
1570 | 1670 | 1770 | 1870 | 1960 | 2160 | ||
MM | KG/100M | KN | KN | KN | KN | KN | KN |
12 | 66.2 | 81.4 | 86.6 | 91.8 | 96.9 | 102 | 112 |
14 | 90.2 | 111 | 118 | 125 | 132 | 138 | 152 |
16 | 118 | 145 | 154 | 163 | 172 | 181 | 199 |
18 | 149 | 183 | 195 | 206 | 218 | 229 | 252 |
20 | 184 | 226 | 240 | 255 | 269 | 282 | 311 |
22 | 223 | 274 | 291 | 308 | 326 | 342 | 376 |
24 | 265 | 326 | 346 | 367 | 388 | 406 | 448 |
26 | 311 | 382 | 406 | 431 | 455 | 477 | 526 |
28 | 361 | 443 | 471 | 500 | 528 | 553 | 610 |
30 | 414 | 509 | 541 | 573 | 606 | 635 | 700 |
32 | 471 | 579 | 616 | 652 | 689 | 723 | 796 |
34 | 532 | 653 | 695 | 737 | 778 | 816 | 899 |
36 | 596 | 732 | 779 | 826 | 872 | 914 | 1010 |
38 | 664 | 816 | 868 | 920 | 972 | 1020 | 1120 |
40 | 736 | 904 | 962 | 1020 | 1080 | 1130 | 1240 |
42 | 811 | 997 | 1060 | 1120 | 1190 | 1240 | 1370 |
44 | 891 | 1090 | 1160 | 1230 | 1300 | 1370 | 1510 |
46 | 973 | 1200 | 1270 | 1350 | 1420 | 1490 | 1650 |
48 | 1060 | 1300 | 1390 | 1470 | 1550 | 1630 | 1790 |
50 | 1150 | 1410 | 1500 | 1590 | 1680 | 1760 |
1. Swift and reliable delivery ensuring your schedule is met.
2. Over 40 years of expertise in professional steel wire rope manufacturing.
3. Comprehensive testing equipment ensures superior product performance.
4. Rigorous quality control processes for impeccable standards.
5. Factory-direct pricing provides a competitive edge.
Payment Terms | T/T | EXW | 30% T/T in advance, the balance to be paid before dispatch |
FOB | |||
CIF | 30% T/T in advance, the balance to be paid against the copy of B/L | ||
CFR (C&F) | |||
L/C | Irrevocable L/C at sight could be accepted if amount above US $50,000.00 | ||
Delivery Time | 7 to 10 working days after receiving advanced payment |